You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap di Jalan Komplek Polri Rampung

Water Channel Retaining Wall Repair on Jalan Komplek Polri Completed

The repair of water channel retaining wall on Jalan Komplek Polri, RT 08/02, Karet Semanggi Urban Village, Setiabudi District, South Jakarta is completed.

Hopefully the water will flow smoothly now

Setiabudi District's Water Resource Implementer Unit Coordinator, Mursani said the retaining wall repair was done based on local resident's request.

Arranging Slum RWs, Pramono Focuses on Improving Basic Infrastructure

"We firstly dredged the mud before repairing the retaining wall," he said, Monday (5/19).

He added that the six Blue Taskforce personnel were deployed to repair retaining wall along 80 meters since April 8, 2025.

"Now the channel is also covered with a plate for the sake of resident's safety," he added.

He hopes the dredging and retaining wall repair will make the surround area free from inundation during rainy season.

Meanwhile, one of the residents, Pujo (45) appreciated the repair. He stated that the area was inundated during heavy rain.

"Hopefully the water will flow smoothly now," he stated.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye753 personDessy Suciati
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye579 personAldi Geri Lumban Tobing
  3. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye543 personFakhrizal Fakhri
  4. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye529 personDessy Suciati
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye515 personAldi Geri Lumban Tobing