You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap di Jalan Komplek Polri Rampung

Water Channel Retaining Wall Repair on Jalan Komplek Polri Completed

The repair of water channel retaining wall on Jalan Komplek Polri, RT 08/02, Karet Semanggi Urban Village, Setiabudi District, South Jakarta is completed.

Hopefully the water will flow smoothly now

Setiabudi District's Water Resource Implementer Unit Coordinator, Mursani said the retaining wall repair was done based on local resident's request.

Arranging Slum RWs, Pramono Focuses on Improving Basic Infrastructure

"We firstly dredged the mud before repairing the retaining wall," he said, Monday (5/19).

He added that the six Blue Taskforce personnel were deployed to repair retaining wall along 80 meters since April 8, 2025.

"Now the channel is also covered with a plate for the sake of resident's safety," he added.

He hopes the dredging and retaining wall repair will make the surround area free from inundation during rainy season.

Meanwhile, one of the residents, Pujo (45) appreciated the repair. He stated that the area was inundated during heavy rain.

"Hopefully the water will flow smoothly now," he stated.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1738 personAldi Geri Lumban Tobing
  2. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye1018 personDessy Suciati
  3. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye999 personDessy Suciati
  4. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye826 personAldi Geri Lumban Tobing
  5. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye748 personDessy Suciati